HAZID in Kazakhstan: Hazard Identification for Industrial Facilities
Hazard identification (HAZID) for industrial facilities and processes.
HAZID (Hazard Identification) is a workshop of specialists in which a facility or project is reviewed against key questions to find potential hazards: what could go wrong, how it develops and what it leads to.
HAZID is carried out at early project stages and when changes are made at a facility, while decisions can still be changed inexpensively. The result is a list of hazards, scenarios with consequences and recommendations on how to manage them.
- Customers and design teams at an early stage of a new facility project.
- Oil and gas and power companies during construction or reconstruction of facilities.
- Owners of operating facilities before changes to the technology or the site.
- EPC contractors that need to identify hazards before detailed design.
Scope of work
- Identification of potential hazards of the facility and process systems.
- Analysis of event scenarios and their consequences.
- Workshop sessions with the participation of the customer's specialists.
- Assessment of existing safeguards and their adequacy.
- Recommendations for managing the hazards identified.
- Preparation of the hazard register and the final report.
How the work is done
- Request and boundaries of analysis. You describe the facility, the project stage and the objectives. We agree the boundaries of the analysis, the list of documents and the composition of the working team.
- Document review. We study the project description, diagrams and layout plans. Questions are sent in advance.
- Workshop sessions. We run HAZID sessions with specialists: we identify hazards and discuss scenarios and consequences.
- Report. We issue the hazard register, scenarios and recommendations in the report.
- Discussion of results. We go through the results with you and agree how the recommendations will be followed up.
What you receive
- Register of identified hazards.
- Description of scenarios and consequences for the key hazards.
- Recommendations for managing hazards, with priorities.
- Final report stating the scope of analysis, participants and assumptions.
The work is usually carried out on the basis of approaches set out in ISO 17776 (guidelines on tools and techniques for hazard identification and risk assessment in the oil and gas industry). The applicable document is agreed with the customer.
Cost
The cost of HAZID is calculated individually after your request. It depends on the scale of the facility, the number of workshop sessions and the composition of the team. What the cost depends on:
- Scale and complexity of the facility or project.
- Number of processes and sites included in the analysis.
- Number and format of workshop sessions.
- Composition and size of the working team.
- Completeness of the input information about the project.
Questions and answers
What is HAZID in simple words?
It is a structured discussion in which the team looks for the hazards of a facility and examines how they could manifest themselves.
When should HAZID be carried out?
Preferably at an early stage of a project and before significant changes, while decisions can be changed without major cost.
How does HAZID differ from HAZOP?
HAZID works at the level of the facility or project as a whole, while HAZOP examines in detail parameter deviations in process diagrams.
Are detailed drawings needed?
No, a project description and general diagrams are enough for HAZID. The more information there is, the more accurate the result.
What should be done with the results?
Recommendations are passed to the responsible persons, and the customer decides which to implement and in what order.