RBI in Kazakhstan: Risk-Based Inspection Planning for Equipment
Risk-based inspection (RBI).
RBI (Risk-Based Inspection) is inspection planning based on risk. Instead of inspecting all equipment in the same way, specialists assess which equipment has a higher probability of failure and more severe consequences, and build the inspection plan accordingly.
Companies order RBI to direct inspection time and budget to where the risk is genuinely higher. The result is a clear, justified plan: what to inspect first, to what extent and how often.
- Oil, gas and petrochemical companies with a large fleet of pressure equipment and piping.
- Power companies that need to plan shutdowns and inspections on a sound basis.
- Integrity and inspection teams who want to replace generic inspection schedules with risk-based plans.
- Asset owners preparing for repairs or life extension who want to set priorities.
Scope of work
- Equipment risk analysis: collecting input data and assessing the probability and consequences of failure.
- Setting inspection priorities based on the results of the risk assessment.
- Planning the scope of inspections: what exactly to inspect and at which locations.
- Planning the inspection frequency for each item of equipment.
- Analysis of existing documentation and inspection history.
- Preparation of the final plan and the justification of the decisions taken.
How the work is done
- Request and scope of work. You describe the unit, the equipment list and the objectives. We agree the boundaries of the analysis and the list of data required.
- Document review. We analyse equipment data: data sheets, diagrams, operating conditions, inspection and repair history.
- Analysis on site. We hold discussions with operations and carry out a walkdown where needed to refine the input data.
- Report. We issue the results of the risk assessment and the proposed inspection plan with its justification.
- Discussion of results. We go through the assumptions and conclusions with you and refine the plan to fit the company's capabilities.
What you receive
- Equipment risk assessment report describing the input data and assumptions.
- Ranking of equipment by risk level.
- Inspection plan: priorities, scope and frequency of inspections.
- Recommendations for updating the plan when operating conditions change.
The work is usually carried out on the basis of API RP 580 and API RP 581, widely used risk assessment methodologies for inspection planning. The applicable document is agreed with the customer.
Cost
The cost of RBI is calculated individually after your request. It depends on the amount of equipment, the completeness of the input data and the required depth of analysis. What the cost depends on:
- Number of equipment items and piping systems.
- Completeness and quality of input data and inspection history.
- Depth of analysis and the selected methodology.
- Need for site visits and discussions with operations.
- Requirements for the format of the inspection plan and its transfer to your records system.
Questions and answers
Why is RBI better than an ordinary inspection schedule?
A calendar-based schedule treats all equipment the same way. RBI takes risk into account, so effort is concentrated where the risk is higher.
What data is needed for the analysis?
Information on the equipment, operating conditions, materials, and inspection and repair history. We agree the exact list at the request stage.
Does RBI replace inspections?
No. RBI helps plan what to inspect and when. The inspections themselves are carried out according to this plan.
Do the results need to be updated?
The plan should be reviewed when operating conditions change and after new inspection results.
Can we start with part of the equipment?
Yes, you can take one unit or a group of equipment and extend the coverage later.